Our Projects
GCB SPA
Conducting Offshore Works for the seawater desalination plant in Corso, with a production capacity of 80,000 m³/day, including the installation of two intake pipelines (Diameter 1400 mm, length 890 m each) and one outfall pipeline (Diameter 800 mm, length 600 m).
Scope of Work:
Dyke works
Excavation
Dredging
Fabrication and installation of ballast blocks
Installation of two intake HDPE pipelines (Diameter 1400 mm, 890 m each)
Installation of one outfall HDPE pipeline (Diameter 800 mm, 600 m)
Excavation, fabrication, and installation of two reinforced concrete intake towers complete with accessories
Installation of anti-trawlers and sign beaconing
Sarpi
Conducting Offshore Maritime Works for the seawater desalination plant in El-Taref, with a production capacity of 300,000 m³/day.
Scope of Work Includes:
Dyke works
Excavation
Dredging
Fabrication and installation of ballast blocks
Installation of intake HDPE pipelines (Diameter 2500 mm, Length 800 m each), complete with acid and hypochlorite HDPE pipelines (Diameter 110 mm)
Installation of outfall HDPE pipelines (Diameter 2000 mm, Length 600 m each)
Excavation, fabrication, and installation of two reinforced concrete intake towers complete with accessories
Installation of anti-trawlers and sign beaconing
ENAC
Conducting Offshore Maritime Works for the seawater desalination plant in Bejaia, with a capacity of 300,000 m³/day.
Our Scope of work include
- Dyke works
- Excavation
- Dredging
- Ballast blocks fabrication and installation
- Installation of intake HDPE Pipeline with Dia 2500 mm and length 380 m / each complete with acid and hypochlorite HDPE pipelines Dia 110 mm
- Installation of outfall HDPE Pipeline with Dia 2000 mm and length 200 m / each
- Excavation ,Fabrication and installation of two reinforced concrete intake tower complete with accessories
- Installation of anti trawlers and sign beaconing