Our Projects

GCB SPA

Conducting Offshore Works for the seawater desalination plant in Corso, with a production capacity of 80,000 m³/day, including the installation of two intake pipelines (Diameter 1400 mm, length 890 m each) and one outfall pipeline (Diameter 800 mm, length 600 m).

Scope of Work:

  • Dyke works

  • Excavation

  • Dredging

  • Fabrication and installation of ballast blocks

  • Installation of two intake HDPE pipelines (Diameter 1400 mm, 890 m each)

  • Installation of one outfall HDPE pipeline (Diameter 800 mm, 600 m)

  • Excavation, fabrication, and installation of two reinforced concrete intake towers complete with accessories

  • Installation of anti-trawlers and sign beaconing

Sarpi

Conducting Offshore Maritime Works for the seawater desalination plant in El-Taref, with a production capacity of 300,000 m³/day.

Scope of Work Includes:

  • Dyke works

  • Excavation

  • Dredging

  • Fabrication and installation of ballast blocks

  • Installation of intake HDPE pipelines (Diameter 2500 mm, Length 800 m each), complete with acid and hypochlorite HDPE pipelines (Diameter 110 mm)

  • Installation of outfall HDPE pipelines (Diameter 2000 mm, Length 600 m each)

  • Excavation, fabrication, and installation of two reinforced concrete intake towers complete with accessories

  • Installation of anti-trawlers and sign beaconing

ENAC

Conducting Offshore Maritime Works for the seawater desalination plant in Bejaia, with a capacity of 300,000 m³/day.

Our Scope of work include

  • Dyke works
  • Excavation
  • Dredging
  • Ballast blocks fabrication and installation
  • Installation of intake HDPE Pipeline with Dia 2500 mm and length 380 m / each complete with acid and hypochlorite HDPE pipelines Dia 110 mm
  • Installation of outfall HDPE Pipeline with Dia 2000 mm and length 200 m / each
  • Excavation ,Fabrication and installation of two reinforced concrete intake tower complete with accessories
  • Installation of anti trawlers and sign beaconing
Scroll to Top